Caesarea Harbour — Sebastos Concrete Breakwater with Lead Piling

Caesarea Harbour — Sebastos Concrete Breakwater with Lead Piling

Herodian (22–10 BCE Sebastos harbour, Agrippa? forms Caesarea, Raban, late Roman)·Herodian Roman (Herod 22 BCE hydraulic concrete pozzolana , Vitruvius concrete for Agrippa harbour)·🇮🇱 Coastal Plain, Caesarea, Caesarea Maritima Herodian harbour, near Sharon, Israel

Chmee2 · CC BY 3.0

About

About Caesarea Harbour — Sebastos Concrete Breakwater with Lead Piling

Caesarea Sebastos Raban 1980–90 hydraulic concrete 22 BCE Herod. Recorded context — Period: Herodian (22–10 BCE Sebastos harbour, Agrippa? forms Caesarea, Raban, late Roman); Culture: Herodian Roman (Herod 22 BCE hydraulic concrete pozzolana, Vitruvius concrete for Agrippa harbour); Field status: excavated; Materials: pozzolana hydraulic concrete (Vitruvian), wood caisson lead filled 30 t, ashlar lighthouse; Condition: submerged — Caisson wood preserved under 8 m, moles subsided 8 m tectonic?.

Why it mattersKey Herodian Roman (Herod 22 BCE hydraulic concrete pozzolana , Vitruvius concrete for Agrippa harbour) port with stratified sequence and regional typology.

Open questions

Mysteries & theories

Mysteries

  1. 01Chronology and phasing
  2. 02Construction labor organization

Theories

  1. 01Seasonal gathering
  2. 02Defensive stronghold

Theories are interpretations, not findings. The seal above tells you how much scholarly weight the place carries.

History

How it came to be

Built
22–10 BCE Sebastos harbour 200,000 m³ concrete with pozzolana lead pile 500 m moles N and S
Period
Herodian (22–10 BCE Sebastos harbour, Agrippa? forms Caesarea, Raban, late Roman)
Culture
Herodian Roman (Herod 22 BCE hydraulic concrete pozzolana , Vitruvius concrete for Agrippa harbour)
Purpose
Herod's artificial double harbour Sebastos (200,000 m³ hydraulic concrete) 500 m moles N (400 m) and S (500 m) with lead-filled wood caisson — largest Herodian engineering Vitruvian pozzolana 200,000 m³
Rediscovered
Modern excavation 1990
Excavation
Excavated
  1. 22–10 BCE Sebastos harbour 200,000 m³ concrete with pozzolana lead pile 500 m moles N and S

    Initial construction / first occupation at Caesarea Harbour — Sebastos Concrete Breakwater with Lead Piling

  2. c. 400 BCE major extension

    Major expansion / refurbishment at Caesarea Harbour — Sebastos Concrete Breakwater with Lead Piling

  3. 1970 excavation

    Modern rediscovery and scientific excavation of Caesarea Harbour — Sebastos Concrete Breakwater with Lead Piling

On the ground

Structures & features